• Egg Harbor Township

  • Upper Pittsgrove to Cardiff Substation Transmission Line Rebuild:

    Atlantic City Electric will remove a 138 kV double circuit lattice tower transmission line and rebuild it with a single steel pole structure within the existing right of way. The current transmission line and lattice towers are more than 80 years old. A 230 kV transmission line will be installed on the south side of the structure and a 138 kV transmission line will be installed on the north side of the structure. The 138 kV line will maintain its existing connection into the Cardiff Substation, as well as, the 230 kV transmission line. The construction of the upgrades will be beneficial to customers since both age and deteriorating conditions as well as reliability issues will be addressed with the same transmission solution.

    Approximately 1 mile of the transmission line will traverse Egg Harbor Township.

    The map shows where the existing line is located in Egg Harbor Township. 

    Cardiff Substation to Lewis Substation, Egg Harbor Township:

    Atlantic City Electric will remove a 138 kV double circuit lattice tower transmission line and rebuild it with a single steel pole structure within the existing right of way. The current transmission line and lattice towers are more than 80 years old. A 138 kV transmission line will be installed on each side of the structure. The 138 kV line will maintain its existing connection at the Lewis Substation. Approximately 5 miles of the transmission line will traverse the Egg Harbor Township. 

    CARDIFF SUBSTATION CONSTRUCTION:

    Atlantic City Electric completed the expansion of the of Cardiff Substation. This work included equipment upgrades and construction of new transmission line terminals.