• Gloucester Township

  • Atlantic City Electric will rebuild the existing Pine Hill-Terrace transmission line. The new line will follow the same route as the existing line and will operate at the same 69kV voltage. The existing wood pole structures are over 60 years-old. Rebuilding this line will address deteriorating conditions and enhance reliability.

    • Approximately 2.5 miles of the transmission line will traverse Gloucester Township along Hickstown and Sicklerville Roads.
    • Gloucester Township Map