• East Greenwich

  • Atlantic City Electric will rebuild the existing Woodstown-Paulsboro line to feed the areas surrounding the new High Street Substation located in Woolwich Township. The new line will utilize a majority of the public existing right of way and be upgraded and energized at 69 kV. The existing wood pole structures are over 80 years old.  Rebuilding this line will address deteriorating conditions and enhance reliability.

    • Approximately 4.5 mile of the transmission line will traverse East Greenwich along Harmony Road and Kings Highway.
    • East Greenwich Map